SiUS041501E
Trial Operation and Field Settings 102
Part 7
Trial Operation and
Field Settings
1. Tips for Servicing ....................................................................................103
1.1 Pump Down Operation ............................................................................. 103
1.2 Forced Cooling Operation ........................................................................ 103
2. Trial Operation ........................................................................................104
3. Field Settings ..........................................................................................105
3.1 Temperature Display Switch .................................................................... 105
3.2 When 2 Units are Installed in 1 Room...................................................... 106
3.3 Facility Setting Switch (cooling at low outdoor temperature)
(Only for RK(X) series) ............................................................................. 107
4. Silicon Grease on Power Transistor / Diode Bridge................................108