EasyManua.ls Logo

Daikin Modular T Smart ATB - Storage Waiting for Installation

Daikin Modular T Smart ATB
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5÷35°C
20
Correct storage awaiting installation
4
Storage waiting for installation
4
Waiting for the installation, the components of the unit and the relative documents must be stored
in an area that:
• is dedicated exclusively to the storage of the units;
• is protected from the weather (preferably prepare a closed area), with adequate temperature and humidity.
• Is accessible only to operators tasked with the assembly.
• Can support the weight of the equipment (check the load rating) and has a stable oor.
• is free from other components, especially if they are potentially explosive/incendiary/toxic.
If you cannot proceed with the installation straight away:
• check periodically that the above-mentioned conditions about the storage area are guaranteed;
• cover the unit with a sheet;
• always provide an insulating base (e.g., wood blocks) between the oor and the unit itself.
Any movement carried out after unpacking must be done with the doors closed. Do not move
the units by pulling on the doors, if present, the uprights or other protruding parts that are not
an integral part of the structure.
Do not step on the units!