EasyManua.ls Logo

Daikin Vision CAH 003-090 C User Manual

Daikin Vision CAH 003-090 C
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and Maintenance Manual IM 672-11
Group: Applied Air Systems
Part Number: IM 672
Date: January 2017
Vision
®
Air Handler
Models CAC/CAH 003—090 C
Question and Answer IconNeed help?

Do you have a question about the Daikin Vision CAH 003-090 C and is the answer not in the manual?

Daikin Vision CAH 003-090 C Specifications

General IconGeneral
BrandDaikin
ModelVision CAH 003-090 C
CategoryAir Handlers
LanguageEnglish

Summary

Introduction

Receiving and Handling

Instructions for inspecting and carefully handling the air handler units upon arrival to prevent damage during installation.

Prior to start up

Pre-startup checks for bearings, fan wheels, sheaves, and belt alignment to ensure proper operation.

Mechanical Installation

Service Clearances

Specifies the required space around the unit for maintenance, including filter replacement and coil access.

Rigging

Instructions for safely lifting and moving air handler units and their components, with warnings about improper lifting.

Unit Leveling

Guidance on placing and leveling the unit on a flat surface to ensure proper alignment and drainage.

Ceiling Hung

Guidelines for suspending air handler units from the ceiling using base rails or angle iron channels.

Multizone Damper Assembly

Steps for field assembly of the multizone damper assembly to the unit.

Multizone Damper Adjustment

Procedure for adjusting multizone damper blades to ensure proper closing and operation.

OSHPD Seismic Anchoring/Mounting

Requirements for seismic anchoring and mounting of units to ensure stability and safety.

Electrical Installation

Wiring

Safety warnings and guidelines for electrical wiring, including conductor types and grounding.

Operation

Startup Checks

Essential checks to perform before starting the unit, ensuring proper installation and safety.

Before Starting the Unit

Crucial pre-operation checks to prevent equipment damage, including fastener tightness and debris removal.

VFD Setup

Guidance on verifying and setting up Variable Frequency Drive (VFD) parameters for optimal fan operation.

Fan Startup

Procedures for starting fans, checking rotation, and adjusting fan speed settings for proper airflow.

Fan Array

Information on the Daikin Fan Array system, including VFDs, fan numbering, and block-off plates.

Operating Limits

Critical operating limits for fan speed and temperature to prevent permanent distortion or fracture.

Fan Vibration Levels

Information on acceptable vibration levels and common causes of excessive fan vibration.

Maintenance

Periodic Maintenance

Schedule for routine checks of moving parts, electrical connections, and signs of water damage.

Fan Drive Adjustments

Instructions for adjusting fan drives, including replacing sheaves and ensuring proper belt tension.

Filters

Information on filter types, pressure drops, and procedures for removing and installing filters.

Removing and Replacing Components

Safety warnings and procedures for removing and replacing major unit components.

Removing and Replacing the Coil

Procedures for removing and replacing various types of coils, including single, stacked, and staggered.

Service and Warranty Procedure

Warranty Return Material Procedure

Procedure for returning defective materials for warranty claims, including tag requirements and shipping.

Check, Test, and Start Procedure Form

AHU Equipment Warranty Registration Form

Form for registering the air handling unit warranty, requiring general and unit information for compliance.

Related product manuals