EasyManua.ls Logo

Danfoss EM-PMI375 - Page 79

Danfoss EM-PMI375
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electric machine weekly maintenance checklist (continued)
N.A PASS FAIL
Functioning of the cooling system in
general
Notes:
Electric machine monthly maintenance checklist
Date:
Electric machine and customer information
Customer: Electric machine type (from the rating plate):
Customer reference: Electric machine serial number:
Service reference: Date installed:
N.A = Procedure not applicable PASS = Procedure passed FAIL = Procedure failed
Electric machine monthly maintenance checklist
N.A PASS FAIL
General construction
Noise or vibration during operation
in general
Cleanliness of the enclosure and
connected parts
Electrical system
Weariness of the cables
Insulation resistance
(If the electric machine is in
continuous use, it is recommended
to do the insulation resistance test
every three or four months.)
Encoder mounting
Cooling system
Functioning of the cooling system in
general
Tightness of the ventilation plug
User Guide
EM-PMI375
Storage, installation and maintenance checklists
©
Danfoss | November 2021 BC265856307805en-000202 | 79

Table of Contents