EasyManua.ls Logo

Danfoss EM-PMI375 - Page 80

Danfoss EM-PMI375
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electric machine monthly maintenance checklist (continued)
N.A PASS FAIL
Cleanliness of the ventilation plug
Notes:
Electric machine yearly maintenance checklist
Date:
Electric machine and customer information
Customer: Electric machine type (from the rating plate):
Customer reference: Electric machine serial number:
Service reference: Date installed:
N.A = Procedure not applicable PASS = Procedure passed FAIL = Procedure failed
Electric machine yearly maintenance checklist
Acceptance N.A PASS FAIL
General construction
Noise or vibration during operation in general
Mounting bolt tightness
D-end attachment bolt
tightening torque
40 Nm
N-end attachment bolt
tightening torque
30 Nm
Cleanliness of the enclosure and connected parts
Electrical system
Weariness of the cables
Electrical connections in general
Cable gland tightening
torque (to the box)
15 Nm
Cable lug tightening torque
(to the busbar)
13 Nm
Connection box cover bolts
tightening torque
4 Nm
Cooling system
User Guide
EM-PMI375
Storage, installation and maintenance checklists
80 |
©
Danfoss | November 2021 BC265856307805en-000202

Table of Contents