EasyManua.ls Logo

Danfoss EM-PMI375 - Page 81

Danfoss EM-PMI375
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electric machine yearly maintenance checklist (continued)
Acceptance N.A PASS FAIL
Coolant flow direction changed and connection checked
Coolant quality as specified
Used coolant:
Functioning of the cooling system in general
Tightness of the tubing and connections (no leakages)
Cleanliness of the ventilation plug
Grounding
Power cable shield connection resistances to ground
(electric machine enclosure) checked
Low voltage cable shield grounding resistances checked
Connection to grounding points checked
Notes:
Do not try to tighten bolts or screws that are not discussed in the product manual and that are not
needed for the normal installation procedures. Sealing of the screws may break.
For cleaning instructions, refer to Chapter Cleaning on page 62.
Used service parts
Part description Part type Quantity Item (order) number
_
_
_
_
User Guide
EM-PMI375
Storage, installation and maintenance checklists
©
Danfoss | November 2021 BC265856307805en-000202 | 81

Table of Contents