5. Install the left and right brake terminals onto the brake terminal bracket using 4 M5 nuts. Torque to 2.3 Nm (20 in-lb).
6. Secure the brake terminal assembly to the mains bus bar support with 2 M8 nuts. Torque to 9.6 Nm (85 in-lb). Refer to
Illustration 1.6.
7. Assemble the mains bus bar subassembly using 9
stand-os
and 9 M5 nuts. Torque to 2.3 Nm (20 in-lb).
Refer to Illustration 1.8.
1 Mains bus bar support bracket 4 M5 nut
2 Stand-os (front and back side of bus bar), indicated by an S in
the drawing
5 Brake terminal assembly (terminals and bracket)
3 Slotted opening for M10 screw 6 Solid mains bus bars
Illustration 1.8 Assembling the Mains Bus Bar Subassembly
Installation Instructions
Bus Bar Kit for 6-pulse, 2-drive System
VLT® Series FC 102, FC 202, and FC 302
6
Danfoss A/S © 02/2016 All rights reserved. MI92I102