EasyManuals Logo

Dea NET24N User Manual

Dea NET24N
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
EN-11
6 STANDARD PROGRAMMING
1 Power Supply
When turned on, “ ”, “ ” (or the current rmware version) “ ”, “ ” (or the selected Type) appear on the display in
sequence followed by the closed gate symbol “----”.
* If the control panel has already been programmed and the power fails or is switched off - once power is returned and a START command
is given, the position reset procedure is performed (see “rESP” in the table “WORKING STATUS MESSAGES” on page EN-18.
2 Visualisation of inputs and operations-counter status
1. Scroll the parameters with the and keys until the
screen reads P013;
2. Access the parameter by pressing the button;
3. The “Input Status” is shown on the screen (check that this
is correct):
4. Press the button again;
5. The “Total Operation Counter”
appears on the
screen followed by the multiplier.
To calculate the number of completed operations, the two
values must be multiplied.
I.e.:
= 120x10 = 1200 operations completed
6. Press the button again;
7. The “Total Maintenance Counter”
appears on the
screen followed by the multiplier.
To calculate the number of operations remaining before
the maintenance request, the two values must be
multiplied.
I.e.:
= 1500x1 = 1500 operations yet to be
completed before the maintenance request
8. Press the
button again to exit the parameters (P013 is
shown on the screen again).

Other manuals for Dea NET24N

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dea NET24N and is the answer not in the manual?

Dea NET24N Specifications

General IconGeneral
BrandDea
ModelNET24N
CategoryControl Panel
LanguageEnglish

Related product manuals