The Start-up Report and Warranty Registration form must be completed and a copy must be sent directly to
Dectron within one week of starting a compressor.
NOTE: Some compressors and electric motors may have part-winding start or Y-
ΔΔ
start. In this case, the
compressor currents to be recorded are the total phase currents, not the currents for each
individual winding.
The startup form can be faxed to Dectron at 1-514-334-9184.
Dectron provides training for installers and service technicians for a nominal fee. Contact the Dectron service
department for details, or download the information at http://dot-library.dyndns.org.
In some cases Dectron may be able to provide Dectron personnel to supervise the startup procedure for a fee.
In this case, the Dectron employee will travel to the site and supervise, guide, and assist the contractor in the start-
up. The Dectron employee does not do the st
art-up, he or she supports and trains the contractor as the contractor
does the start-up. This service is referred to as “factory startup supervision”.
Factory startup supervision must be purchased in advance to allow for scheduling personnel. Before Dectron
personnel can be assigned to the task, the Dectron service department must receive:
1. the completed pre-startup checklist found in Startup - Pre-Startup Checklist.
Each applicable item of the checklist must be initialed (use “N/A” where an item is not applicable) and
both sides of all pages of the checklist must be signed and dated by the responsible party. The responsible
party must be authorized to obligate his company to pay for the factory startup assistance.
2. telephone confirmation from the responsible party to the Dectron service department that all applicable
steps of the installation and startup procedure, along with any other steps specified by the Dectron service
department have been completed.
The responsible party may request a specific date for the factory startup supervision. The Dectron
service department will then schedule factory startup supervision with the responsible party.
Upon accepting the scheduled date for factory startup supervision, the responsible party accepts the
responsibility to:
1. provide a qualified and licensed (as necessary) refrigeration technician to be on site for the duration of the
factory startup supervision,
The technician will accomplish the startup while being instructed as necessary by the Dectron
employee. This training will be of great value in any future service to the equipment.
2. provide and install any extra material such as refrigerant, wire, or other,
3. provide any necessary equipment such as hand tools, instruments, pumps, ladders, etc., and
4. make available as necessary any other personnel necessary to the startup, such as pool, plumbing, and
electrical contractors.
NOTE: If upon arrival the Dectron employee sees that installation steps have been neglected he will return
to Dectron and the full price of the factory startup supervision will be billed. Examples of such
neglected steps include, but are not limited to
,
incomplete connection of electric power,
incomplete ductwork,
incomplete connection of remote condenser (if any),
incomplete control wiring,
pool not filled,
water features not operable, etc.
Dectron, Inc. March 2012