Figure 14. Two-post ush-mount conguration
2 Attach one rail to the front post ange with two user-supplied screws. See item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post ange with two user-supplied
screws. See item 3.
4 Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
NOTE: For S5296F-ON installation instructions, see S5296F-ON four-post rack assembly.
1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post ange with two user-supplied
screws. See item 1 in the following illustration:
S5200F-ON Series switch installation
27