EasyManuals Logo

Dell EMC Z9264F-ON Setup Guide

Dell EMC Z9264F-ON
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Z9264F-ON switch installation
To install the Z9264F-ON switch, complete the installation procedures in the order
presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any
eld replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
Unpack
Four-post rack assembly
Four-post rack mount
Ground cable
Optics installation
Switch power-up
After switch installation
Unpack
NOTE
: Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
When unpacking the Z9264F-ON switch, make sure that the following items are included:
One Z9264F-ON switch
One RJ-45 to DB-9 female cable
3
10 Z9264F-ON switch installation

Other manuals for Dell EMC Z9264F-ON

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell EMC Z9264F-ON and is the answer not in the manual?

Dell EMC Z9264F-ON Specifications

General IconGeneral
BrandDell EMC
ModelZ9264F-ON
CategorySwitch
LanguageEnglish

Related product manuals