Site preparations
The Z9264F-ON switch is suitable for installation as part of a common bond network
(CBN).
You can install the switch in:
Network telecommunication facilities
Data centers
Other locations where the National Electric Code (NEC) applies
For more information about the Z9264F-ON switch specications, see Specications.
NOTE: Install the switch into a rack or cabinet before installing any optional
components.
Topics:
Site selection
Cabinet placement
Rack mounting
Switch ground
Fans and airow
Power
Storing components
Site selection
Install your equipment in restricted access areas. A restricted access area is one where
service personnel can only gain access using a special tool, lock, key, or other means of
security. The authority responsible for the location controls access to the restricted area.
2
6 Site preparations

Other manuals for Dell EMC Z9264F-ON

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell EMC Z9264F-ON and is the answer not in the manual?

Dell EMC Z9264F-ON Specifications

General IconGeneral
BrandDell EMC
ModelZ9264F-ON
CategorySwitch
LanguageEnglish

Related product manuals