EasyManua.ls Logo

Dell Networking S6000 - Configuring a Two-Post Flush-Mount

Dell Networking S6000
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24 | Install the S6000
www.dell.com | support.dell.com
Configuring a Two-Post Flush-Mount
Step Task
1 For this configuration, remove the castings from the front side of each ReadyRails assembly. Refer to
Figure 4-2
,
item 1. To remove the two screws from each front flange ear (on the switch side of the rail) and remove each
casting, use a Torx driver. Retain the castings for future rack requirements. It is not necessary to remove the rear
flange castings.
Figure 4-2. Two-Post Flush-Mount Configuration
2 Attach one rail to the front post flange with two user-supplied screws. Refer to
Figure 4-2
, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with
two user-supplied screws. Refer to
Figure 4-2
, item 3.
4 Repeat this procedure for the second rail.

Table of Contents

Related product manuals