EasyManua.ls Logo

Dell Networking S6000 - Configure a Four-Post Thread

Dell Networking S6000
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 | Install the S6000
www.dell.com | support.dell.com
Configure a Four-Post Thread
Step Task
1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. To remove the
two screws from each flange ear and remove each casting, use a Torx driver. Refer to
Figure
, item 1. Retain the
castings for future rack requirements.
2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer
to
Figure
, item 2.
Figure 4-4. Four-Post Threaded Configuration

Table of Contents

Related product manuals