3.6.4 Interconnection of Battery with Power Plant
Connect battery main positive & negative wire with SMPS dedicated Battery Negative &
Positive point, make sure SMPS based power plant should capable to handle LIB Battery.
Connect Main power wire with power plant
Warning!
If there are any problems during installation, please contact Delta service personnel
immediately to avoid equipment damage or safety accidents.
3.6.5 Communication Cable Installation:
Use RJ45 connector cable connect between battery module and Power device.
12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta SEG-48100-02I and is the answer not in the manual?

Delta SEG-48100-02I Specifications

General IconGeneral
BrandDelta
ModelSEG-48100-02I
CategoryControl Unit
LanguageEnglish

Related product manuals