1. Make sure that the power system connected to the battery is a qualified communication
power system.
2. When installing the battery, please make sure that the power supply system is in the off
state without current, and that the battery module is turned off.
3. There must be a corresponding level of insulation measures for the power cables. It is
forbidden to have exposed power cables.
4. Ensure that the battery and power system are grounded reliably during installation
3.2 Environment Requirement
The installation environment must meet the product operating temperature, storage
temperature, relative humidity, and atmospheric pressure requirements. The installation site
must be free from conductive dust and corrosive gases, explosion hazards, vibration bumps,
and away from heat and fire sources
3.3 Tool Required For Installation
Before removing the battery module from the box, inspect the cartons/box for any damage.
Then check the integrity of the parts to see if any damage. If this happens, contact the
shipping staff immediately.
The following tools list are provided for reference when installing the system
Installation Tool Installation Tool
Installation and User's Manual Diagonal Cutting Pliers
Screwdriver (slot, cross) Meter
Wrench Current Meter
Long nose pliers Insulation tape
Wire stripper Anti-static bracelet
Clipping pliers Cable tie
09

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta SEG-48100-02I and is the answer not in the manual?

Delta SEG-48100-02I Specifications

General IconGeneral
BrandDelta
ModelSEG-48100-02I
CategoryControl Unit
LanguageEnglish

Related product manuals