EasyManua.ls Logo

Develop ineo 223 - Space Requirements

Develop ineo 223
294 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ineo 223/283/363/423 1-25
1.9 Space requirements
1
1.9 Space requirements
To ensure that machine operation, consumables replenishing, part replacement, and regular maintenance
can easily be performed, adhere to the recommended space requirements detailed below.
NOTICE
Be sure to allow a clearance of 3-15/16 inches (100 mm) or more at the back of this machine for the ventilation
duct.
25-7/8 (658) 38-7/16 (976)
64-5/16 (1634)
11-9/16
(293)
32-13/16 (834)
ineo 423/363/283/223+DF-621+PC-208+FS-527+SD-509
Unit: inch (mm)
16-1/4
(412)
32-1/8 (816)
46-3/4 (1187)
61-1/8 (1553)
12-13/16
(325)
3-15/16
(100)
5-7/8
(150)
38-7/16 (976)
51-15/16 (1320)
11-9/16
(293)
32-13/16 (834)
ineo 423/363/283/223+DF-621+PC-208+FS-529
Unit: inch (mm)
46-3/4 (1187)
61-1/8 (1553)
12-13/16
(325)
16-1/4
(412)
32-1/8 (816)
7-5/8
(194)
3-15/16
(100)
38-7/16 (976)
3-15/16
(100)
42-5/8 (1083)
11-9/16
(293)
32-13/16 (834)
ineo 423/363/283/223+DF-621+PC-208+JS-505 Unit: inch (mm)
46-3/4 (1187)
61-1/8 (1553)
4-3/16
(107)
12-13/16
(325)
32-1/8 (816)
16-1/4
(412)

Table of Contents

Related product manuals