EasyManuals Logo

Deye Spring Series User Manual

Deye Spring Series
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
~
23
~
5.7 Visual Inspection of the Connection
After connecting the battery, check for:
Usage of positive and negative cables.
Connection of the positive and negative terminals.
All the bolts are tightened.
Cables fixation and the appearance.
The installation of the protecting cover.
5.8 System startup and shutdown
Power on steps
After installation, wiring, and configuration, you must check all connections. When the
connection is correct.
①After the inverter is connected to the battery pack in the off state, turn on the inverter
first.When the screen lights up, turn on the battery pack circuit breaker(
"OFF" to the "ON"
).
②Press the switch button.
③When the LED is fully lit, the power is successfully powered on.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Deye Spring Series and is the answer not in the manual?

Deye Spring Series Specifications

General IconGeneral
BrandDeye
ModelSpring Series
CategoryBattery Pack
LanguageEnglish

Related product manuals