5. System Health Check / Maintenance
NOTE: These are checks that should be carried out regularly to ensure that your Dimplex product
performs at its best.
5.1 Heat pump:
• Is the fan grille clear from debris? - Visual check
• Is the tray clear from debris and water owing freely? - Visual check
• Is the condensate drain clear from debris?
• Is the evaporator coil clean and free from damage? E.g. attened ns
• Are all of the outer panels secure?
5.2 Electrical:
• Is the power cable rmly xed?
• Is the earth wire connection secure?
• Is the supply voltage correct?
5.3 Hydraulics:
• Is the system correctly pressurized?
• Are there any water leaks in the system? Is the required pressure holding?
• Is the strainer on the return pipe clear of debris?
See section 4.1.3 for details on isolating and cleaning the strainer.
5.4 Indoor settings:
• Are the set temperatures and heating times suitable for the occupants?
• Is the building warm enough for the occupants or does the heating curve need to be adjusted?
NOTE: It is recommended that the strainer is checked and cleaned 24 hours after commissioning, and
each time the system is modied or has service work carried out thereafter.