EasyManua.ls Logo

Dimplex LBW 300 - Sacrificial Anode

Dimplex LBW 300
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
7.3 Sacrificial Anode
The sacrificial anode installed in the hot water tank for corrosion protection purposes, must be checked electrically
on a regular basis, at least every two years
after commissioning, and be replaced, if necessary. The electrical
check is to be conducted by means of a suitable ammeter
without
draining the water in the tank.
Procedure:
n
Withdraw PE conductor from tab of sacrificial anode.
o
Connect ammeter (0...50 mA) between PE conductor and tab.
p
Evaluation of wear of sacrificial anode:
Measured value > 1 mA sacrificial anode is okay.
Measured value < 1 mA sacrificial anode must be checked or replaced.
If an unambiguous electrical check is not possible, we recommend that a visual inspection of the sacrificial anode
be performed by a qualified expert.
(For a replacement of the sacrificial anode that may be necessary [to be performed by an expert], the water must
be drained from the tank via the drain valve (to be provided upon installation – see appendix.
Caution
: Sacrificial anodes that are impaired in their function will reduce the life of the unit!
Fig. 10: Sacrificial anode
(sectional view of tank)
The sacrificial anode is screwed into the storage tank below
the immersion heater
(covered with a plastic cap)

Related product manuals