EasyManua.ls Logo

Ditch Witch JT30 - Page 158

Ditch Witch JT30
245 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT30 /JT30 All Terrain Operator’s Manual Systems and Equipment - 158
Pipeloader
CMW
Install Pipe Box
1. Move pipe box over pipeloader and lower into position.
2. Install threaded caps on back pins.
3. Install front pin.
4. Remove lift block and pin.
NOTICE: Pipe box should only be installed onto pipeloader when pipe box shuttle is in first row position.

Table of Contents