Controls - 33 JT30 /JT30 All Terrain Operator’s Manual
Left Control Console
CMW
Pipeloading Controls
1. Pipe lift switch
2. Rear wrench rotation switch
3. Rear wrench clamp switch
4. Front wrench clamp switch
5. Pipe shuttle switch
6. Pipe gripper switch
7. Pipe lubricator switch
8. Pipe box position switch
9. Add pipe/manual/remove pipe switch
10. Set/Resume switch
Item Description Notes
1. Pipe lift switch To raise, press top.
To lower, press bottom.
To stop, release.
1
2
3
4
5
67
8
9
10
j34om002w.eps