EasyManua.ls Logo

Ditch Witch JT30 - Page 84

Ditch Witch JT30
245 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT30 /JT30 All Terrain Operator’s Manual Prepare - 84
Plan Bore Path
CMW
AT Cobble pipe
Minimum depth (D) Entry pitch (A) Setback (B) Depth to begin steering (S)
4 ft 5 in (1.3 m) 18% / 10.2° 43 ft 5 in (13.2 m) 1 ft 1 in (0.33 m)
5 ft 4 in (1.6 m) 20% / 11.3° 47 ft 4 in (14.4 m) 1 ft 3 in (0.38 m)
6 ft 3 in (1.9 m) 22% / 12.4° 51 ft 3 in (15.6 m) 1 ft 4 in (0.41 m)
7 ft 3 in (2.2 m) 24% / 13.5° 55 ft 2 in (16.8 m) 1 ft 6 in (0.46 m)
8 ft 4 in (2.5 m) 26% / 14.6° 58 ft 11 in (18.0 m) 1 ft 7 in (0.48 m)
9 ft 6 in (2.9 m) 28% / 15.6° 62 ft 8 in (19.1 m) 1 ft 8 in (0.51 m)
10 ft 8 in (3.3 m) 30% / 16.7° 66 ft 5 in (20.2 m) 1 ft 10 in (0.56 m)
IMPORTANT: Numbers in table based on 210’ (53 m) minimum bend radius, beacon housing, EZ-
Connect, connector, transition sub, and 1/3 of first drill pipe (L, totaling 6’ 4” [2.6 m]) in the ground before
steering.

Table of Contents