JT30 /JT30 All Terrain Operator’s Manual Transport - 96
Load
CMW
Procedure
Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.
NOTICE:
• Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.
• Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.
Note: If hauling unit without pipe box, remove remaining pipe in drill frame chute.
Distance U.S. Metric
A 12-45” 31-114 cm
B 12-45” 31-114 cm
C less than 55” less than 140 cm