Cleaning and caring for the inverter SinePower
20
Setting net configuration
Using the S5 dip switch you can define in which net configuration the inverter shall
operate.
11 Cleaning and caring for the inverter
A
➤ Occasionally clean the product with a damp cloth.
Dip switch
Parameter S5
TN grid
An external downstream circuit breaker (RCD) is
necessary.
Off
IT grid
Operation with one load only or installation of an
external insulation monitor.
National standards shall apply!
On
NOTICE!
Do not use sharp or hard objects or cleaning agents for cleaning as these
may damage the product.
DSP1300T-3500T--IO-16s.book Seite 20 Freitag, 1. Dezember 2017 8:54 08