EasyManuals Logo

Dormakaba SVA 6 Series Commissioning Instructions

Dormakaba SVA 6 Series
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
SVA 6xxx Commissioning instructions
060652-45532 – 05/20236
5 Mounting
Note
If necessary, change operating current (OC) to
quiescent current (QC). Can only be used in versions
for solid doors.
Fig.2
OC
QC
1.
2.
3.
Change operating current to quiescent current
Mounting takes place when the door unit is
assembled.
See SVA/SVI assembly instructions.
https://techdoc.dormakaba.com/cds/go/SVA-SVI
SVI commissioning manuals
https://techdoc.dormakaba.com/cds/go/SVI
6 Disassembly and disposal
Disassembly is carried out in reverse order of the
mounting instructions.
The product must not be disposed of in
domestic waste.
Dispose of the product in an environmentally
friendly manner at the arranged acceptance
and collection points.
Refer to the statutory regulations for your country.

Other manuals for Dormakaba SVA 6 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dormakaba SVA 6 Series and is the answer not in the manual?

Dormakaba SVA 6 Series Specifications

General IconGeneral
BrandDormakaba
ModelSVA 6 Series
CategoryDoor locks
LanguageEnglish

Related product manuals