EasyManua.ls Logo

Dräger Atlan A300 - Performing the tests

Dräger Atlan A300
332 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instructions for use | Atlan A300, A300 XL, A350, A350 XL SW 1.0n 127
Tests
8.2 Available test types
8.3 Performing the tests
8.3.1 System test and leakage test
Prerequisites:
– Electronically controlled gas mixer: Central O
2 supply or central Air supply is
connected
– Mechanically controlled gas mixer: Central O
2 supply is connected
– The anesthetic gas receiving system is correctly connected.
Both tests consist of a checklist followed by an automatic test. The automatic test
consists of a pretest (the initialization), which may require manual actions by the
user, and a fully automatic main test.
System test
Type and duration: Automatic, approximately 8 min
Perform the test: Daily
Description: Initialization:
– Checking of components which frequently cause
operational restrictions: e.g., high leakage, incor-
rect setting of APL valve
– Calibration of the O
2 sensor (every 7 days)
The initialization takes approximately 2 to 3 minutes.
Remain by the device during this time. Make correc-
tions if necessary.
Scope of test:
– Calibration of all valves and sensors
– Test of all device functions
– Performance of leakage test
Leakage test
Type and duration: Automatic, approximately 2 min
Perform the test: – After filling the CO
2 absorber
– After changing the hose configuration (e.g.,
changed hoses, changed lengths of extendable
hoses etc.)
– After replacing the breathing system
– After inserting the piston diaphragm
– After replacing the flow sensors
– If leakage at vaporizer is suspected (see "Check-
ing a vaporizer for leakage", page 130)
Description: – Determining leakage, system compliance, and
system resistance
– Calibration of valves and flow sensors, if required.
In this case, the test is extended by
approximately 3 minutes.

Table of Contents