EasyManua.ls Logo

E-FLITE Cap 232 BP 3D - Page 32

E-FLITE Cap 232 BP 3D
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14. The installation of the elevator linkage follows
the same procedure as the aileron linkage. The
only difference is you will be using the medium
8
1
/2" (215mm) length carbon pushrod linkage
during assembly.
15. The last linkage to install is for operating
the rudder. The long 9
7
/8" (250mm) carbon
pushrod is used for the rudder.
32

Related product manuals