EasyManua.ls Logo

Eastron SDM630-Mbus V2 - Setup - Demand Integration Time; Setting Demand Integration Time (DIT)

Eastron SDM630-Mbus V2
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EASTRON SDM630-Mbus V2 User Manual
EASTRON Germany @ B+G e-tech GmbH Franz-Mehring Str. 36 01979 Lauchhammer
WEB: www.eastron-germany.de Mail: info@bg-etech.de Fax: +49 3574 4675519
- 9 -
2-3
Repeat the procedure for the remaining
three digits
2-4
After setting the last digit, SET will show.
Press to exit the number setting routine and return to the Set-up menu. SET will be
removed
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: 0, 5, 8, 10, 15, 20, 30, 60 minutes
1
From the set-up menu, use and
buttons to select the DIT
option. The screen will show the
currently selected integration time.
2-1
Press to enter the selection
routine.
The current time interval will flash
2-2
Use and buttons to
select the time required.

Related product manuals