EASTRON SDM630-Mbus V2 User Manual
EASTRON Germany @ B+G e-tech GmbH – Franz-Mehring Str. 36 – 01979 Lauchhammer
WEB: www.eastron-germany.de Mail: info@bg-etech.de Fax: +49 3574 4675519
Repeat the procedure for the remaining
three digits
After setting the last digit, SET will show.
Press to exit the number setting routine and return to the Set-up menu. SET will be
removed
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: 0, 5, 8, 10, 15, 20, 30, 60 minutes
From the set-up menu, use and
buttons to select the DIT
option. The screen will show the
currently selected integration time.
Press to enter the selection
routine.
The current time interval will flash
Use and buttons to
select the time required.