EasyManua.ls Logo

Eaton 9355 - 4.5 Internal Battery Tray Wiring Connections

Eaton 9355
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton 9355 UPS (20/30kVA) Installation and Operation Manual 164201626—Rev F www.eaton.com/powerquality 63
Chapter 9 Parallel Communication
The Powerware Hot Sync CAN Bridge Card, shown in Figure 47, can be installed to provide connectivity for
operational mode control and metering of a parallel system at any UPS in the system.
Figure 47. Powerware Hot Sync CAN Bridge Card
To install the Powerware Hot Sync CAN Bridge Card:
1. Remove the UPS front door (see page 10).
2. Remove the communication wiring access plate from the UPS rear panel and punch a hole in it using a
Greenlee punch or similar device (see Figure 48).
3. Install conduit for the communication wiring.
Figure 48. Communication Wiring Access
Plug-in Terminal Block
Communication
Wiring Access Plate

Table of Contents

Other manuals for Eaton 9355

Related product manuals