Eaton 93E UPS 15-80 kVA (380/400/415 V) Installation and Operation Manual
© Eaton Corporation plc 2015. All rights reserved. Revision: 001
Document ID: 614-01975-00
105 (133)
7. Open the UPS input and bypass feeder circuit breakers.
8. Open all external battery breakers.
7.3.10 Charger control
To turn the battery charger on:
1. Select the
CONTROLS
symbol in the main menu bar.
The System Control screen is displayed.
2. Select
Battery
in the System Control screen.
3. In the Battery System Control screen, select the
RESTING
CHARGING
command and press the push button.
To turn the battery charger off:
1. Select the
CONTROLS
symbol in the main menu bar.
The System Control screen is displayed.
2. Select
Battery
in the System Control screen.
3. In the Battery System Control screen, select the
CHARGING
RESTING
command and press the push button.
7.3.11 Battery test
NOTE: This UPS has a user initiated battery test that is intended to
determine if the batteries are able to support the load.
The battery test can only be initiated when the battery is fully charged.
This normally occurs within 72 hours of the start of a charging cycle.
The command is not shown if the test cannot be run.
To start the battery test:
1. Select the
CONTROLS
symbol in the main menu bar.
The System Control screen is displayed.
2. Select
Battery
in the System Control screen.
3. In the Battery System Control screen, select the
RESTING
TESTING
command and press the push button.