EasyManua.ls Logo

Eaton 93PM - Table 3-2. Eaton 93 PM IBC-SW Cabinet Clearances

Eaton 93PM
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Plan and Unpacking
Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual P-164000639—Rev 1 www.eaton.com/powerquality 3-3
The IBC–SW uses natural convection cooling to regulate internal component temperature. Air inlets are in the
front of the cabinet and outlets are on the back or top of the cabinet. Allow clearance in front of, and on back
or top of the cabinet for proper air circulation. The clearances required around the IBC–SW cabinet are shown
in Table 3-2.
Table 3-2. Eaton 93PM IBC–SW Cabinet Clearances
From Top of Cabinet with Rear Exhaust Option 203.2 mm (8") minimum clearance
From Top of Cabinet with Top Exhaust Option 203.2 mm (8") minimum clearance
From Front of Cabinet 914.4 mm (36") working space
From Back of Cabinet with Top Exhaust Option 203.2 mm (8") minimum clearance
From Back of Cabinet with Rear Exhaust Option 203.2 mm (8") minimum clearance
From Right Side of Cabinet None Required
From Left Side of Cabinet None Required

Table of Contents

Other manuals for Eaton 93PM

Related product manuals