EasyManua.ls Logo

Eaton 9PHD - Site Preparations

Eaton 9PHD
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3)
Strain reliefs, metal, manufacturer types as an example:
M50
- Wiska 21-35 mm 10065006, EMSKV 50
- Jacob 21-35 mm 50.650 M/R
- Hummel 22-29 mm 1.618.5000.51
- Hummel 27-35 mm 1.618.5000.50
- Hummel 25-31 mm 1.609.5000.51
- Hummel 32-38 mm 1.609.5000.50
- Jacob 24-35 mm 50.650 M
- Pflitsch 31-42 mm bg 250 ms
M40
- Wiska 16-28 mm 10065005, EMSKV 40
- Jacob 16-27 mm 50.640 M/R
M32
- Wiska 13-21 mm 10065004, EMSKV 32
- Jacob 12-21 mm 50.632 M/R
For more information on how to connect external battery cabinets to a UPS,
refer to the User’s and Installation Guide of the UPS in question.
3.2 Site preparations
The accessory cabinet installation site must meet the following guidelines.
Install the system indoors on a level floor suitable for computer or electronic
equipment.
Install the system in a temperature and humidity controlled indoor area.
Install the system in an area that is free of conductive contaminants and has
sufficient air exchange.
Eaton 9PHD Accessory Cabinets TFC-A, EBC-F
and EBC-G User's and installation guide
©
Eaton Corporation plc 2022. All rights reserved. Document ID: P-164000538 17 (63)

Related product manuals