5. PROCEDURE FOR INSTA
LLING AN FU CABINET SYSTEM
5.1 Oponal equipment
6. Mount the pipe thread elbow adapters to the control valve’s In and Out ports and ghten the
coupling nuts. Do not put any mechanical load on ngs or use them to support pipes.
Connect the system to water supply and downstream pipework without turning on the water
supply. Do not confuse In and Out ports. They are embossed with direcon arrows.
7. Remove the front panel by pulling the locking tabs on the le and right side. Run the power cord
through the cord guide in the control valve’s backplate and connect it to 12 VAC socket on the circuit
board. Plug the power supply in the mains to power up the system.
8. Start manual regeneraon of the system. Scroll regeneraon to backwash if it isn’t the 1st step of
the sequence. When the control valve starts the backwash, turn on mains water supply slightly at
rst. Air will be displaced from the system via drain line while the pressure tank is being lled with
water. When the tank is full, water will start owing down the drain line. At this point, fully open
mains water supply.
Let the system complete regeneraon, then perform one more manual regeneraon.
Soening systems can be
addionally equipped with a Clack
or Mulblock bypass valve.
The Clack bypass valve is aached
directly to the inlet and puried
water pipes and has 4 operang
modes, listed below:
NORMAL OPERTION
DIAGNOSTIC MODE
BYPASS OPERTION
SHUT OFF MODE
“TREATED”
WATER EXIST
SUPPLY
WATER EXIST
SUPPLY
WATER EXIST
NO WATER
EXIST
SUPPLY WATER
ENTERS
SUPPLY WATER
ENTERS
SUPPLY WATER
ENTERS
SUPPLY WATER IS SHUT
OFF FROM THE HOUSE
AND THE VALVE