EasyManuals Logo

Edge-Core ECS2100 Series User Manual

Edge-Core ECS2100 Series
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
Quick Start Guide
– 4 –
The ECS2100-10PE includes an AC-DC power adapter. Connect the AC-DC power
adapter to the switch and to an AC power source. The AC-DC adapter provides
54 VDC, 1.67 A of power to the switch.
Caution:
Before connecting the switch to DC power, the grounding terminal
screw on the switch rear panel must be permanently connected to earth.
5. Verify Switch
Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the Diag and Power LEDs should both be on green.
Plug the AC power cord into the socket on the rear of the switch.
1
1
Plug the DC power cable into the socket on the rear of the switch.
Plug the AC-DC power adapter into a nearby AC power outlet.
1
1
2
System Status LEDs.
1
1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Edge-Core ECS2100 Series and is the answer not in the manual?

Edge-Core ECS2100 Series Specifications

General IconGeneral
BrandEdge-Core
ModelECS2100 Series
CategorySwitch
LanguageEnglish

Related product manuals