C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 39 –
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
PACKAGE CONTENTS
◆ Gigabit Smart Switch (ECS4310-26T)
◆ Bracket Mounting Kit (two rack-mounting brackets and eight screws)
◆ Four adhesive foot pads
◆ Power Cord—either US, Continental Europe or UK
◆ Installation and Management Guide CD
OPTIONAL RACK-MOUNTING EQUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
◆ Four mounting screws for each device you plan to install in a rack—these
are not included
◆ A screwdriver (Phillips or flathead, depending on the type of screws used)