40
Installation
Connections
Collective ue gas outlet over-pressure
An installation with a collective
ue gas outlet over-pressure in
combination with individually
controlled boilers (e.g. 0-10 V
control), where no bus cable is
connected, is NOT allowed.
Diameter and venting lengths of the
uegasoutlet/airsupply:
- Open system with over-pressure.
NOTE!
1. IPX0D at ue category B
23
and B
33
2. Only with bus cable connected!
3. Adjust parameter 102 to 2
Diameter and venting lengths of the
uegasoutlet/airsupply:
- Closed system with over-pressure.
Please contact ELCO.
d
d
=d
=d
d
Dimensions cascade ue THISION L PLUS
Open system, overpressure
Output (80/60) d = minimum diameter Ø in mm
[kW] h = 2 - 5 h = 6 - 10 h = 11 - 15 h = 16 - 20
114 - 240 150 150 150 150
240 - 360 150 150 180 180
360 - 480 180 180 180 200
480 - 600 200 220 220 220
600 - 660 230 230 250 250
660 - 872 260 260 260 260
872 - 960 280 280 280 300
960 - 1200 280 280 280 300
Dimensions cascade ue THISION L PLUS
Closed system, overpressure, parallel
Output (80/60) d = minimum diameter Ø in mm
[kW] h = 2 - 5 h = 6 - 10 h = 11 - 15 h = 16 - 20
114 - 285 150 150 150 150
285 - 524 200 200 200 200
524 - 1440 300 300 300 300