INSTALLATION INSTRUCTIONS | SMART LINE BOILING PAN
EN | 10-2018 DOC N° ST0 9183-02 5
INSTALLATION
12. INSTALLATION DIAGRAM ...............................................20
12.1 Dimensions and connection points (SM6B, SM6V, S6MP) ............................... 20
12.2 Dimensions and connection points, boiling pans with option ice water cooling (SV6I, SP6I) ..... 21
12.3 Frames and fixtures ............................................................ 22
12.4 Boiling pans SM6B, SM6V, SM6P ................................................. 23
12.5 Boiling pans with option ice water cooling SV6I, SP6I .................................. 25
12.6 Multi stand .................................................................. 27
13. INSTALLATION OF PANS BACK TO BACK ..................................30
13.1 Models: SM6B, SM6V, SM6P .................................................... 30
13.2 Models: Boiling pan with the option ice water cooling: SV6I, SP6I ......................... 30
14. POSITIONING OF BOILING PANS IN THE FIELD ..............................31
14.1 Models: SM6B, SM6V, SM6P .................................................... 31
14.2 Models: Boiling pan with the option ice water cooling SV6I, SP6I ......................... 31
14.3 Adjustment of the boiling pans position ............................................. 32
14.4 Lid adjustment ............................................................... 32
CONNECTIONS
15. WATER CONNECTION ..................................................33
15.1 Ice water connection for option ice water cooling ..................................... 33
15.2 Filling pressure vessel with water .................................................. 33
16. ELECTRICAL CONNECTION .............................................34
16.1 Potential equalisation .......................................................... 34
16.2 Phase sequence .............................................................. 34
16.3 Tilting function ................................................................ 34
17. CONTROL PANEL .....................................................35
AGITATOR
18. FILLING WITH GREASE ................................................36
19. CONTROL TESTING ...................................................36
19.1 Inspection ................................................................... 36
19.2 Control testing of safety valve .................................................... 36
19.3 Testing ..................................................................... 36
20. MAINENANCE OF VESSEL BEARINGS .....................................37
ACCESSORIES
21. FACTORY FITTED ACCESSORIES .........................................38
22. SUPPLEMENTARY EQUIPMENT & ACCESSORIES ............................39
23. OTHER DOCUMENTATION ..............................................39