EasyManua.ls Logo

Elite Screens Aeon CineWhite A8K Series - Screen Assembly Guide; Frame Construction Steps

Elite Screens Aeon CineWhite A8K Series
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev.08232021JA www.elitescreens.com U-00235 3
Frame Assembly
Step 1: Place the included soft padded sponge sheet on a clean area where the screen will be assembled.
Step 2: Position the pieces of the frame on the sponge sheet in the arrangement shown below
Step 3: Insert center joint (a/b) connectors into one-half of the horizontal frame (B/C) and secure with the M4x7
screws (M) as shown in the illustration below.
Tip: The center joint (b) with the larger diameter holes should be on top.
Step 4: Connect the elbow joints (c/d) to the top and bottom sections of the vertical frame. Once inserted, connect
the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are
flush (no gaps). They should form perfect right angles.
Tip: The elbow joint (d) with the larger diameter holes should be on top.
Item
Parts List
103
123
135
150
a.
Center Joints- M4 (bottom position)
2
2
2
2
b.
Center Joints-D5 (top position)
2
2
2
2
c.
Elbow Joints M4 (bottom position)
4
4
4
4
d.
Elbow Joints D5 (top position)
4
4
4
4
e.
Side cover Center Joints- M4
2
2
2
2
f.
Side cover Elbow Joints M4
4
4
4
4
g.
M4x7 Screws
24
24
24
24
h.
Spring
52
60
68
72
i.
Spring Hook
2
2
2
2
j.
wall brackets
4
4
4
4
k.
Φ5x50 Wall Screws
8
8
8
8
l.
Hollow Wall anchors
8
8
8
8
m.
M4x4 Screws
24
24
24
24
n.
Angle cover
4
4
4
4
o.
Center Support Bar
1
1
1
1
p.
White gloves
2
2
2
2
q.
Spring
4
4
4
4
r.
Φ3 mm Long Iron (sides) rod/ Short rod (top/bottom)
2/4
2/4
2/4
2/4
c.
d.
b.
a.
a.
b.
g.
Sponge Sheet
Sponge Sheet

Related product manuals