Do you have a question about the Embassy ONEX and is the answer not in the manual?
Procedure for immediate actions and contacting authorities if gas odor is detected.
Critical safety warnings and precautions before operating the boiler.
Instructions for mounting the boiler and making gas/water connections.
General precautions and requirements for boiler electrical wiring.
Procedure for safely connecting the main power supply to the boiler.
Guidelines for installing vent and combustion air systems for safe operation.
Description of the split polypropylene venting system and its components.