EasyManua.ls Logo

EMC CX4 Series - Page 15

EMC CX4 Series
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EMC Rails and Enclosures (CX4 Series Storage Systems) Field Installation Guide
15
Installing a 2U storage processor enclosure (SPE) in a cabinet
Figure 10 2U pin alignment
4. Pull the adjustable rail forward to the inner side of the front
channel (the surface facing the rear of the cabinet), and align the
three holes on the rail with those in the channel.
5. Secure the rail to the front channel using one of the provided
screws at the bottom hole of the rail. Allow the screw to draw the
rail and channel together. Leave the screw slightly loose to allow
for adjustment after you install the enclosure.
6. Repeat Steps 3 through 5 on the left side, with the left rail.
7. From the rear of the cabinet, use two of the provided screws to
secure each rail to the rear channel. Tighten the screws.
2U
Alignment pins
here

Related product manuals