40
EMC Rails and Enclosures (CX4 Series Storage Systems) Field Installation Guide
Installing a 4U storage processor enclosure (SPE) in a cabinet
Installing a 4U storage processor enclosure (SPE) in a cabinet
Follow the steps below to install a 4U SPE in a standard 19" NEMA 
cabinet.
Enclosure mounting kit
Before you start, be sure you have all the materials listed in Table 7. 
Tools are not part of your purchased enclosure assembly.
Table 7 Enclosure mounting kit materials
Component Use
2 adjustable rails (20.5-34 inches) Attach front to back on either side 
between NEMA channels in a standard 
19" cabinet 
Phillips M5 12.7 mm screws Attach the rail mounting hardware
(L) 
(R) 
CL4062