EasyManua.ls Logo

EMC CX4 Series - Page 18

EMC CX4 Series
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
EMC Rails and Enclosures (CX4 Series Storage Systems) Field Installation Guide
Installing a 2U storage processor enclosure (SPE) in a cabinet
Follow these steps to install the enclosure on the rails in the cabinet:
1. With help from another person, lift the enclosure and, from the front
of the cabinet, slide the enclosure onto the rails as shown in
Figure 12.
Figure 12 Sliding an enclosure onto the mounting rails
When the enclosure slides to the back of the cabinet, the two
notches in the rear of the enclosure insert into the rear tabs on
each rail. The tabs secure and support the rear of the enclosure.
If the chassis does not slide all the way into the cabinet, you may
need to loosen the screws that hold the rear of the rails in place,
then adjust the rails to allow the tabs to fit into the notches.
2. Once the enclosure is completely seated into the rear tabs, tighten
the two screws (one on each rail) that secure the rails to the front
channels.
CL4137

Related product manuals