4. Connect the antenna to the lightning arrestor using the supplied
coaxial cable ensuring the drip loop is not closer than 1 ft. (0,3m)
from the lightning arrestor.
5. Connect the lightning arrestor to the Gateway using the supplied
coaxial cable.
6. Use the coaxial sealant to seal each connection between the Gate-
way, lightning arrestor, cable, and antenna.
7. Ensure the mounting mast, lightning arrestor, and Gateway are
grounded according to local/national electrical codes.
8. Place any spare lengths of coaxial cable in 12-in. (0,3 m) coils.
Figure 4-2: Installation of WL3/WL4 Option
A Control building
B Remote antenna
C Cable
D Drip loop
E Lightning arrestor
F Gateway
G Ground
H Earth
Quick Start Guide September 2020
16 Emerson.com/Rosemount