Ferrites installed on a standard cableFigure 6-7:
Install ferrites on an armor-jacketed cable
1. Make standard connections to the CSI 9420 terminal block and grounding screw.
2. Slide the first of the three ferrites at the location on the cable approximately 1 in.
from the point where the cable enters the gland.
3. Secure the ferrite using a wire tie, heat-shrink, or any other method approved for
your location.
4. Slide the second and third ferrites onto the cable adjacent to the first, and secure
them in place with a wire tie or heat-shrink.
Accelerometer EMI and RFI considerations
MHM-97408, Rev 15 109