2-13
Rosemount 2088 and 2090
Figure 2-5. PTFE Installing the Weld Spud.
Figure 2-6. PTFE Gasket Placement.
Figure 2-7. Rosemount 2090P Mounting Configuration Using a Weld Spud.
PREPARING THE VESSEL HOLE
4
6
8
1
3
5
7
2
Process
Vessel
Bevelled
Edge
Weld Spud
100–125 Amps
recommended
308L SST
2.37 (60)
Code “C” in Model Structure or
P/N 02088-0195-0005
WELDING SEQUENCE
Heat Isolation
Grooves
PTFE Gasket
Nameplate
2 ¼–20
UNC–2BX
Depth 0.60
Mounting
Holes
Bevelled Edge
Vessel
Wall
Weld Spud
DETAIL OF WELD SPUD
Vessel Wall
100–125 Amps
recommended
Weld Spud
Aotewell Ltd
www.aotewell.com
Industry Automation
HongKong|UK|China
sales@aotewell.com
+86-755-8660-6182

Table of Contents

Other manuals for Emerson Rosemount 2090P

Related product manuals