EasyManua.ls Logo

enphase IQ System Controller 3M - Table of Contents

enphase IQ System Controller 3M
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
IQ System Controller 3M quick install guide
Table of contents
Full Energy Independence conguration
Whole home backup with IQ System Controller 3M
What’s in the box
Tools/additional items required
Section A
Mounting the product
Plan a location for the IQ System Controller
Step 1: Recommended clearance
Step 2: Install the mounting bracket
Step 3: Remove the door
Section B
Mounting the breakers
Internal view of IQ System Controller 3M
Breakers for IQ8 Systems
Install main breakers
Breakers for NFT and IQ Gateway
Section C
Wiring
Drill conduits
DER wiring
Aux wiring: System Shutdown Switch
Aux wiring: IQ Load Controller
Main/supply side wiring
CT wiring
Wiring control (CTRL) cable to headers
Control (CTRL) wiring between system components
Section D
Power Control System (PCS)
Introduction
Setting up PCS on-site during commissioning
Close and energize IQ System Controller
Safety
Revision history
Addendum A: Wire sizes
and tightening torque
Compatibility
Specications
Mechanical specications
Electrical specications
Addendum B: Wiring the system
bonding jumper wire

Related product manuals