9
IQ System Controller 3M quick install guide
Tools/additional items required
S. NO ITEM NAME QUANTITY SOURCE
1 CT-200-CLAMP or CT-200-SPLIT 3
Included with IQ Combiner
and/or COMMS-KIT-02
2 IQ Meter Collar 1 Enphase store
3 EP200G-HNDL-R1 (lifting handle) 1 Enphase Store
4 Breakers, dierent ratings 4 Enphase Store/retail outlets
5 Conduits (with ttings and tting tools) As required Provided by installer
6 Drill 1 Provided by installer
7 5/32" pilot bit 1 Provided by installer
8 Screwdriver 1 Provided by installer
9 Wrench 1 Provided by installer
10 Adjustable wrench 1 Provided by installer
11 Torque wrench 1 Provided by installer
12 Level tool 1 Provided by installer
13 5/32" Allen key 1 Provided by installer
14 Conductor stripper 1 Provided by installer
15 Electrician’s hole saw (2") or punch set 1 Provided by installer
16 Stud nder (if required) 1 Provided by installer
17 Conduit ground hub rings 1 Provided by installer
18
#10,1/4" or 5/16" lag bolts or screw 3" long (depending
on attaching wall) for each wall-mount bracket
As required Provided by installer
19 Control wire As required Distribution/Enphase Store**
** Enphase SKU for control cable: CTRL-SC3-NA-01
WARNING: Do not use power tools for electrical connections.