EasyManua.ls Logo

Enviro PILATUS PC12 - Special Procedures; Expansion Valve Alignment

Enviro PILATUS PC12
89 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Component Maintenance Manual
12037 N Highway 99
Seminole, OK 74868
Phone (405) 382-0731
Fax (405) 382-0737
http://www.enviro-ok.com
Copyright © 2017
ATA 21-00-23
Page | 78
Revision 10
June 1, 2017
SPECIAL PROCEDURES
TASK 21-00-23-82-801
12.0 SPECIAL PRODECURES
SUBTASK 21-00-23-82-001
12.1 Expansion Valve Alignment:
12.1.1 The expansion valve is set at the factory, but there may be times when it must be adjusted
to assure proper refrigerant flow at the desired evaporating temperature; for example,
excessive pressure drop for long suction line runs. Any adjustment must not affect typical
suction and discharge pressures as outlined in Table 5.
12.1.2 Tools, fixtures, equipment, or consumable items required:
Small hand tools and socket set
Micrometer
Scribe or wire hook
Volt-OHM meter (digital)
Shop air, 40 PSIG max
Respiration mask
External aircraft power source
Inspection mirror
Thermometer, 0-150° F
Flashlight or service lamp
R-134A service manifold and gauge set

Table of Contents