EasyManua.ls Logo

Etac Molift Nomad - Climbing Between Rail Systems; Climbing Procedure Steps

Etac Molift Nomad
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 11 of 20
Climbing
With Molift NOMAD it is possible to climb between
two rail systems, and then we can avoid cut-outs
above the doors. There must be a trolley with a
climbing belt present on both rail systems.
Move the lifter until it stops at the end of the
rail, and move the trolley on the opposite side
as close as possible.
Raise the lifter until it is possible to attach the
climbing belt on the opposite trolley to the lift-
ers handle.
Lower the lifter until it hangs in the climbing
belt only.
The lifter will stop if the lifting belt is untight.
Move the lifting belt to the opposite trolley
with the attachment arm.
Run the lifter up until it hangs in the lifting belt.
The climbing belt can be released, and the lifter
can be run up and down as normal.
Trolley
Climbing belt
Rail
Handle
Lifting belt
Climbing
belt

Related product manuals